INFRASTRUCTURE & UTILITIES WORK FOR TWO PRODUCTION WELLS AT WA’AD AL SHAMAL WELL FIELD

INFRASTRUCTURE & UTILITIES WORK FOR TWO PRODUCTION WELLS AT WA’AD AL SHAMAL WELL FIELD

  • Location: Turaif
  • Value: 42,400,000 SAR
  • EPC: Kettaneh Construction
  • Client: Ma'aden
  • Brief Project Details:
    • Piping: Process well pumps system including piping, power, instrumentation, and communication to the central control building
    • Building Works: Two electrical substations with civil works, HVAC, fire protection and detection, lighting, power, earthing, telecommunication, and instrumentation
  • Completion Period: 10 months (January 2020 to October 2020)
  • Concrete: 400 m3
  • Excavation: 49158 m3
  • Reinforcing Steel: 30,000 kg
  • Backfill: 34997 m3
  • Formwork: 700 m2
  • Piping Works (GRV with average size 600mm): 7 KM
  • Medium Voltage Cables: 6KM
  • Fiber Optic Cables: 16 KM